The objective is: 
213568
The running time is: 
1110.13
The time meeting best is: 
1041.56
Location: 0(load: 295) 
 Route 0(load: 147) 89 65 55 2 88 33 54 68 80 91 
 Route 1(load: 148) 28 47 53 76 4 17 62 36 29 8 
Location: 1(load: 696) 
 Route 0(load: 150) 46 90 40 32 77 43 75 38 0 6 
 Route 1(load: 146) 84 9 56 11 7 27 1 50 20 
 Route 2(load: 149) 52 51 98 3 71 58 61 22 41 99 
 Route 3(load: 145) 13 26 94 97 39 83 21 30 64 
 Route 4(load: 106) 85 96 81 14 31 16 
Location: 4(load: 592) 
 Route 0(load: 148) 70 34 37 67 5 79 82 10 18 
 Route 1(load: 148) 12 63 69 42 23 49 93 60 
 Route 2(load: 148) 74 78 57 45 35 25 15 44 19 73 
 Route 3(load: 148) 24 86 87 92 48 72 95 59 66 
The actual cost is 213568
